Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,323
matching recommendationsSIC | 49 | Electric, Gas, And Sanitary Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0139 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $944 | $2,630 | Implemented |
BS0139 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $929 | $200 | Implemented |
BS0139 # 03 Y:2020 | 03 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $3,565 | $17,520 | Not Implemented |
NL0050 # 01 Y:2020 | 01 | 2020 | USE AUTOMATIC CLEANING EQUIPMENT | $4,536 | $22,386 | Implemented |
NL0050 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,749 | $5,975 | Implemented |
NL0050 # 03 Y:2020 | 03 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $328 | $2,465 | Implemented |
NL0050 # 04 Y:2020 | 04 | 2020 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $117 | $388 | Implemented |
NL0050 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $58 | $280 | Implemented |
UU0169 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,976 | $124,680 | Implemented |
UU0169 # 02 Y:2020 | 02 | 2020 | USE EXISTING DAM TO GENERATE ELECTRICITY | $24,451 | $120,000 | Not Implemented |
UU0169 # 03 Y:2020 | 03 | 2020 | USE OPTIMUM TEMPERATURE | $4,303 | $0 | Implemented |
UU0169 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $514 | $2,100 | Implemented |
UU0168 # 01 Y:2020 | 01 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,906 | $0 | Implemented |
UU0168 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,729 | $15,550 | Implemented |
UU0168 # 03 Y:2020 | 03 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,221 | $8,000 | Not Implemented |
UU0168 # 04 Y:2020 | 04 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,063 | $0 | Implemented |
UU0168 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $251 | $0 | Implemented |
UU0168 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $178 | $0 | Implemented |
OK1027 # 01 Y:2020 | 01 | 2020 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $70,403 | $206,750 | Not Implemented |
OK1027 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,303 | $6,900 | Not Implemented |
OK1027 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,207 | $7,407 | Not Implemented |
OK1027 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,521 | $4,542 | Implemented |
OK1027 # 05 Y:2020 | 05 | 2020 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $48,801 | $12,552 | Not Implemented |
TT0240 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $78,503 | $20 | Not Implemented |
TT0240 # 02 Y:2020 | 02 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $199,826 | $110,000 | Not Implemented |