IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,323

matching recommendations
Reset
SIC 49 Electric, Gas, And Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0015 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,893 $2,389 Not Implemented
TR0015 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,060 $1,959 Not Implemented
TR0015 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $1,234 $616 Not Implemented
TR0015 # 04 Y:2019 04 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,095 $3,250 Implemented
TR0015 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,388 $0 Implemented
TR0015 # 06 Y:2019 06 2019 MAINTAIN MACHINES TO REDUCE LEAKS $1,094 $844 Implemented
TR0015 # 07 Y:2019 07 2019 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $483,876 $1,077,133 Not Implemented
TR0015 # 08 Y:2019 08 2019 REDUCE HEAT GAIN BY WINDOW TINTING $520 $483 Not Implemented
UU0155 # 01 Y:2019 01 2019 ADOPT IN-HOUSE MATERIAL GENERATION $102,278 $823,000 Implemented
UU0155 # 02 Y:2019 02 2019 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $14,015 $46,625 Not Implemented
UU0155 # 03 Y:2019 03 2019 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $898 $1,650 Implemented
AM0786 # 01 Y:2019 01 2019 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $55,800 $67,044 Implemented
AM0786 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $11,700 $15,300 Implemented
AM0786 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,750 $22,600 Implemented
AM0786 # 04 Y:2019 04 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,760 $4,570 Implemented
AM0786 # 05 Y:2019 05 2019 USE SYNTHETIC LUBRICANT $910 $290 Implemented
UF0535 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $35,230 $127,650 Implemented
UF0535 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,527 $0 Implemented
UF0535 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $3,486 $3,283 Implemented
UF0535 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,073 $2,563 Implemented
UF0535 # 05 Y:2019 05 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $2,330 $6,000 Implemented
UF0535 # 06 Y:2019 06 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,344 $1,400 Implemented
MI0358 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $713,110 $8,242,656 Implemented
MI0358 # 02 Y:2019 02 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $478,275 $6,028,646 Implemented
MI0358 # 03 Y:2019 03 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $270,674 $806,400 Implemented