Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsSIC | 49 | Electric, Gas, And Sanitary Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0633 # 01 Y:2022 | 01 | 2022 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $14,598 | $23,000 | Not Implemented |
WV0633 # 10 Y:2022 | 10 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $246 | $878 | Implemented |
WV0633 # 09 Y:2022 | 09 | 2022 | INSULATE BARE EQUIPMENT | $447 | $1,572 | Implemented |
WV0633 # 08 Y:2022 | 08 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $640 | $1,280 | Implemented |
WV0633 # 07 Y:2022 | 07 | 2022 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,011 | $1,500 | Implemented |
WV0633 # 06 Y:2022 | 06 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $1,637 | $5,130 | Not Implemented |
WV0633 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $2,533 | $1,543 | Implemented |
WV0633 # 04 Y:2022 | 04 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $4,626 | $4,080 | Not Implemented |
WV0633 # 03 Y:2022 | 03 | 2022 | DIRECT WASTE GASSES TO BOILER COMBUSTION AIR | $4,724 | $12,236 | Not Implemented |
WV0633 # 02 Y:2022 | 02 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,775 | $16,600 | Not Implemented |
WV0631 # 01 Y:2022 | 01 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $30,923 | $89,840 | Not Implemented |
WV0631 # 02 Y:2022 | 02 | 2022 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $22,924 | $32,450 | Not Implemented |
WV0631 # 06 Y:2022 | 06 | 2022 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $560 | $1,500 | Implemented |
WV0631 # 04 Y:2022 | 04 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $2,204 | $1,911 | Not Implemented |
WV0631 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,513 | $4,998 | Implemented |
WV0631 # 05 Y:2022 | 05 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $1,092 | $1,292 | Implemented |
WV0611 # 07 Y:2021 | 07 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $244 | $1,213 | Not Implemented |
WV0611 # 08 Y:2021 | 08 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $191 | $29 | Implemented |
WV0611 # 06 Y:2021 | 06 | 2021 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $830 | $4,080 | Not Implemented |
WV0611 # 05 Y:2021 | 05 | 2021 | DEVELOP A REPAIR/REPLACE POLICY | $1,003 | $761 | Implemented |
WV0611 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,767 | $2,029 | Not Implemented |
WV0611 # 03 Y:2021 | 03 | 2021 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,803 | $3,254 | Implemented |
WV0611 # 02 Y:2021 | 02 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,923 | $240 | Implemented |
WV0611 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,448 | $734 | Implemented |
WV0588 # 02 Y:2020 | 02 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $9,425 | $9,350 | Not Implemented |