IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 4941 Water Supply
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0633 # 10 Y:2022 10 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $246 $878 Implemented
WV0633 # 09 Y:2022 09 2022 INSULATE BARE EQUIPMENT $447 $1,572 Implemented
WV0633 # 08 Y:2022 08 2022 DEVELOP A REPAIR/REPLACE POLICY $640 $1,280 Implemented
WV0633 # 07 Y:2022 07 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,011 $1,500 Implemented
WV0633 # 06 Y:2022 06 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $1,637 $5,130 Not Implemented
WV0633 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $2,533 $1,543 Implemented
WV0633 # 04 Y:2022 04 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $4,626 $4,080 Not Implemented
WV0633 # 03 Y:2022 03 2022 DIRECT WASTE GASSES TO BOILER COMBUSTION AIR $4,724 $12,236 Not Implemented
WV0633 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,775 $16,600 Not Implemented
WV0633 # 01 Y:2022 01 2022 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $14,598 $23,000 Not Implemented
WV0631 # 04 Y:2022 04 2022 UPGRADE CONTROLS ON COMPRESSORS $2,204 $1,911 Not Implemented
WV0631 # 06 Y:2022 06 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $560 $1,500 Implemented
WV0631 # 05 Y:2022 05 2022 DEVELOP A REPAIR/REPLACE POLICY $1,092 $1,292 Implemented
WV0631 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,513 $4,998 Implemented
WV0631 # 02 Y:2022 02 2022 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $22,924 $32,450 Not Implemented
WV0631 # 01 Y:2022 01 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $30,923 $89,840 Not Implemented
WV0588 # 05 Y:2020 05 2020 DEVELOP A REPAIR/REPLACE POLICY $691 $651 Implemented
WV0588 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,724 $0 Implemented
WV0588 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,027 $10,000 Not Implemented
WV0588 # 02 Y:2020 02 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,425 $9,350 Not Implemented
WV0588 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,179 $22,995 Implemented
WV0568 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,605 $52,080 Not Implemented
WV0568 # 05 Y:2018 05 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $73,200 $3,000 Not Implemented
WV0568 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $1,251 $562 Implemented
WV0568 # 03 Y:2018 03 2018 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $3,286 $3,400 Implemented