Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsSIC | 4941 | Water Supply |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0254 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,182 | $5,868 | n/a |
UU0254 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $264 | $504 | n/a |
UU0254 # 04 Y:2024 | 04 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,472 | $2,250 | n/a |
UU0254 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $509,495 | $6,000,000 | n/a |
UU0254 # 02 Y:2024 | 02 | 2024 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $9,712 | $81,738 | n/a |
UU0254 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,358 | $5,447 | n/a |
UU0203 # 03 Y:2022 | 03 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,080 | $10,070 | Not Implemented |
UU0203 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,358 | $60,000 | Not Implemented |
UU0203 # 01 Y:2022 | 01 | 2022 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $33,490 | $103,200 | Not Implemented |
UU0200 # 01 Y:2022 | 01 | 2022 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $41,228 | $52,800 | Not Implemented |
UU0200 # 02 Y:2022 | 02 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,992 | $10,000 | Not Implemented |
UU0200 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,392 | $5,232 | Implemented |
UU0197 # 07 Y:2022 | 07 | 2022 | USE OPTIMUM TEMPERATURE | $380 | $200 | Not Implemented |
UU0197 # 01 Y:2022 | 01 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $13,098 | $10,000 | Implemented |
UU0197 # 02 Y:2022 | 02 | 2022 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $12,033 | $300 | Implemented |
UU0197 # 03 Y:2022 | 03 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,900 | $3,000 | Implemented |
UU0197 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $1,591 | $6,000 | Not Implemented |
UU0197 # 06 Y:2022 | 06 | 2022 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $130 | $25 | Implemented |
UU0197 # 04 Y:2022 | 04 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,230 | $4,000 | Implemented |
UU0169 # 03 Y:2020 | 03 | 2020 | USE OPTIMUM TEMPERATURE | $4,303 | $0 | Implemented |
UU0169 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,976 | $124,680 | Implemented |
UU0169 # 02 Y:2020 | 02 | 2020 | USE EXISTING DAM TO GENERATE ELECTRICITY | $24,451 | $120,000 | Not Implemented |
UU0169 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $514 | $2,100 | Implemented |
UU0168 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $178 | $0 | Implemented |
UU0168 # 04 Y:2020 | 04 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,063 | $0 | Implemented |