IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,725

matching recommendations
Reset
SIC 495 Sanitary Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0153 # 02 Y:2019 02 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $14,902 $205,000 Implemented
UU0153 # 03 Y:2019 03 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $22,776 $146,977 Not Implemented
UU0153 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $5,443 $502 Not Implemented
UU0153 # 05 Y:2019 05 2019 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,777 $6,500 Implemented
UU0153 # 06 Y:2019 06 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $899 $2,019 Implemented
UU0153 # 07 Y:2019 07 2019 ADJUST BURNERS FOR EFFICIENT OPERATION $1,444 $400 Implemented
OR0721 # 01 Y:2019 01 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $40,539 $84,752 Not Implemented
OR0721 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,383 $7,807 Not Implemented
OR0721 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,615 $5,884 Not Implemented
OR0721 # 04 Y:2019 04 2019 REDUCE HEAT GAIN BY WINDOW TINTING $1,700 $12,122 Not Implemented
SF0537 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,931 $378 Not Implemented
SF0537 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,708 $260 Implemented
SF0537 # 03 Y:2019 03 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $94,349 $10,000 Not Implemented
SF0537 # 04 Y:2019 04 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,414 $648 Implemented
SF0537 # 05 Y:2019 05 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $24,937 $5,000 Not Implemented
SF0537 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,025 $5,039 Implemented
SF0537 # 07 Y:2019 07 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $2,238 $3,000 Implemented
SF0537 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $77,542 $235,055 Implemented
SF0537 # 09 Y:2019 09 2019 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) $41,345 $175,000 Not Implemented
TR0013 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $1,099 $216 Implemented
TR0013 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,439 $0 Implemented
TR0013 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,097 $7,743 Implemented
MA0803 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,194 $11,175 Implemented
MA0803 # 02 Y:2019 02 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,308 $1,000 Implemented
MA0803 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,935 $3,589 Implemented