IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

152

matching recommendations
Reset
SIC 4952 Sewerage Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0790 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $4,100 $5,300 Implemented
AM0790 # 01 Y:2019 01 2019 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,870 $29,400 Implemented
AM0790 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,921 $12,100 Implemented
AM0790 # 04 Y:2019 04 2019 USE SYNTHETIC LUBRICANT $415 $510 Implemented
AM0790 # 05 Y:2019 05 2019 USE PHOTOCELL CONTROLS $235 $17 Implemented
CL1915 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,751 $41,281 Implemented
CL1915 # 01 Y:2019 01 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $47,547 $200,000 Not Implemented
CL1915 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,899 $0 Implemented
CL1915 # 02 Y:2019 02 2019 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $15,899 $5,500 Implemented
TR0018 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,937 $6,050 Implemented
TR0018 # 01 Y:2019 01 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,196 $14,000 Not Implemented
TR0018 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,055 $1,825 Implemented
TR0018 # 05 Y:2019 05 2019 RECOVER MECHANICAL ENERGY $5,431 $25,000 Not Implemented
TR0018 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,038 $308 Not Implemented
UD1004 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $34,429 $0 Not Implemented
UD1004 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,533 $0 Not Implemented
UD1004 # 03 Y:2019 03 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,185 $0 Not Implemented
UD1004 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,158 $0 Not Implemented
UD1004 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,197 $0 Not Implemented
LS1911 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,381 $174 Not Implemented
LS1911 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,502 $12,000 Not Implemented
LS1911 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $651 $25 Not Implemented
LS1911 # 06 Y:2019 06 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $40,165 $22,200 Not Implemented
LS1911 # 05 Y:2019 05 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,758 $500 Not Implemented
LS1911 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,832 $1,736 Not Implemented