IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

99

matching recommendations
Reset
SIC 51 Wholesale Tradenondurable Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0566 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,974 $1,450 Implemented
LE0566 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,023 $1,320 Implemented
LE0566 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $403 $210 Implemented
LE0566 # 01 Y:2024 01 2024 UPGRADE CONTROLS ON COMPRESSORS $6,466 $600 Implemented
LE0566 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,530 $640 Implemented
LE0566 # 07 Y:2024 07 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,444 $1,000 Implemented
MZ1000 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,061 $1,100 Implemented
MZ1000 # 05 Y:2023 05 2023 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $2,995 $2,131 Implemented
MZ1000 # 04 Y:2023 04 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,463 $900 Implemented
DL0227 # 04 Y:2023 04 2023 USE OPTIMUM TEMPERATURE $6,362 $0 Implemented
DL0227 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,653 $0 Implemented
DL0227 # 06 Y:2023 06 2023 INSTALL TIMERS AND/OR THERMOSTATS $5,836 $30,292 Implemented
DL0227 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,298 $0 Implemented
UL2215 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,172 $939 Implemented
KS2206 # 03 Y:2022 03 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,067 $4,835 Implemented
KS2206 # 06 Y:2022 06 2022 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $397 $0 Implemented
KS2206 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $741 $390 Implemented
KS2206 # 04 Y:2022 04 2022 ISOLATE HOT OR COLD EQUIPMENT $2,342 $3,334 Implemented
LS1022 # 07 Y:2022 07 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $84,344 $218,400 Implemented
LS1022 # 01 Y:2022 01 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $1,456 $0 Implemented
WM0178 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $139 $0 Implemented
LS1022 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $270 Implemented
WM0178 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $154 $0 Implemented
LS1022 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $71,544 $66,750 Implemented
WM0178 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $404 $2,564 Implemented