IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 822 Colleges And Universities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0245 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $299 $100 Implemented
UU0245 # 03 Y:2024 03 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,961 $3,200 Implemented
UU0245 # 01 Y:2024 01 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $13,514 $18,000 Implemented
ORC010 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $16,690 $0 Implemented
MUCM13 # 01 Y:2023 01 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $132 $675 Implemented
MUCM13 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4 $20 Implemented
MUCM13 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $298 $42 Implemented
MUCM12 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $848 $2,033 Implemented
UU0226 # 03 Y:2023 03 2023 USE OPTIMUM TEMPERATURE $2,090 $2,000 Implemented
UU0226 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,162 $2,000 Implemented
UU0226 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,910 $800 Implemented
ORC006 # 04 Y:2023 04 2023 MINIMIZE WATER USAGE $1,964 $8,000 Implemented
CM1002 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,003 $44,000 Implemented
CM1002 # 05 Y:2022 05 2022 REDUCE VENTILATION AIR $21,000 $740,000 Implemented
OK1039 # 01 Y:2021 01 2021 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $361 $570 Implemented
OK1039 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $3,438 Implemented
OK1039 # 03 Y:2021 03 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $421 $488 Implemented
UU0174 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,383 $85,347 Implemented
UU0174 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $744 $200 Implemented
UU0174 # 01 Y:2021 01 2021 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $24,060 $178,852 Implemented
UU0165 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $660 $660 Implemented
UU0165 # 04 Y:2020 04 2020 AIR CONDITION ONLY SPACE NECESSARY $1,220 $1,500 Implemented
UU0162 # 04 Y:2020 04 2020 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $328 $1,141 Implemented
UU0162 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,096 $5,759 Implemented
UU0162 # 01 Y:2020 01 2020 REDUCE FLUID FLOW RATES $8,259 $17,871 Implemented