IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68,656

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0406 # 01 Y:1993 01 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,316 $3,168 Implemented
KU0406 # 03 Y:1993 03 1993 COVER OPEN TANKS $1,525 $1,125 Implemented
KU0406 # 04 Y:1993 04 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $572 $489 Implemented
KU0406 # 06 Y:1993 06 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $290 $30 Implemented
AS0097 # 04 Y:1993 04 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $61,773 $50,500 Implemented
AS0097 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $822 $800 Implemented
AS0097 # 09 Y:1993 09 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $180 Implemented
AS0096 # 01 Y:1993 01 1993 ADD AREA LIGHTING SWITCHES $1,219 $2,012 Implemented
AS0096 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,441 $0 Implemented
AS0096 # 05 Y:1993 05 1993 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,006 $7,200 Implemented
AS0096 # 08 Y:1993 08 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $909 $500 Implemented
AS0096 # 11 Y:1993 11 1993 ISOLATE HOT OR COLD EQUIPMENT $1,577 $300 Implemented
AS0096 # 12 Y:1993 12 1993 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $178 $100 Implemented
TN0504 # 01 Y:1993 01 1993 INSTALL TIMERS AND/OR THERMOSTATS $9,438 $3,000 Implemented
TN0504 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $8,307 $1,125 Implemented
TN0504 # 04 Y:1993 04 1993 REPAIR AND ELIMINATE STEAM LEAKS $2,208 $1,350 Implemented
TN0504 # 05 Y:1993 05 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,202 $1,500 Implemented
TN0504 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $7,362 $770 Implemented
TN0504 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,227 $1,416 Implemented
TN0504 # 10 Y:1993 10 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,383 $1,856 Implemented
TN0504 # 11 Y:1993 11 1993 INSULATE BARE EQUIPMENT $318 $375 Implemented
KU0405 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,867 $475 Implemented
KU0405 # 08 Y:1993 08 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $241 $0 Implemented
IA0063 # 01 Y:1993 01 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $21,047 $82,940 Implemented
IA0063 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,186 $100 Implemented