IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68,668

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0599 # 13 Y:2020 13 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,644 $1,250 Implemented
WV0599 # 14 Y:2020 14 2020 INSULATE BARE EQUIPMENT $361 $1,123 Implemented
WV0598 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $7,292 $6,768 Implemented
WV0598 # 06 Y:2020 06 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $916 $1,021 Implemented
WV0598 # 07 Y:2020 07 2020 DEVELOP A REPAIR/REPLACE POLICY $564 $613 Implemented
UK2003 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $4,628 $1,586 Implemented
UK2003 # 05 Y:2020 05 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $15,645 $28,100 Implemented
GT0949 # 03 Y:2020 03 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,978 $400 Implemented
GT0949 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,159 $451 Implemented
MZ0297 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,041 $51,700 Implemented
MZ0297 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $7,129 $24,780 Implemented
MZ0297 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $320 $840 Implemented
MZ0297 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,880 $2,595 Implemented
MZ0297 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,857 $350 Implemented
MZ0297 # 08 Y:2020 08 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $397 $300 Implemented
UK2002 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,770 $2,473 Implemented
UK2002 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $473 $160 Implemented
UU0171 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,969 $4,000 Implemented
TT0243 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $294,548 $574,658 Implemented
TT0243 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,111 $600 Implemented
NC0651 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,900 $12,818 Implemented
NC0651 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $754 $780 Implemented
UA0229 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,905 $2,000 Implemented
UA0229 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,562 $6,700 Implemented
GT0948 # 01 Y:2020 01 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,480 $2,300 Implemented