Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
66,998
matching recommendationsARC | 2 | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0028 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $863 | $112 | Implemented |
MU0028 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $643 | $1,100 | Implemented |
UF0598 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $61,221 | $34,460 | Implemented |
UF0598 # 03 Y:2023 | 03 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $30,832 | $8,310 | Implemented |
UF0598 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,433 | $14,328 | Implemented |
UF0598 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $10,556 | $22,000 | Implemented |
UF0598 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,338 | $432 | Implemented |
UF0598 # 08 Y:2023 | 08 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $8,114 | $0 | Implemented |
UF0598 # 09 Y:2023 | 09 | 2023 | INSTALL TURBULATORS | $6,732 | $7,500 | Implemented |
UF0598 # 10 Y:2023 | 10 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,588 | $2,800 | Implemented |
WV0647 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,420 | $19,102 | Implemented |
WV0647 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,411 | $1,508 | Implemented |
WV0647 # 05 Y:2023 | 05 | 2023 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $4,595 | $9,440 | Implemented |
WV0647 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,516 | $864 | Implemented |
WV0647 # 08 Y:2023 | 08 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,315 | $114 | Implemented |
WV0647 # 11 Y:2023 | 11 | 2023 | INSULATE BARE EQUIPMENT | $1,681 | $195 | Implemented |
UL2305 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,738 | $0 | Implemented |
UL2305 # 08 Y:2023 | 08 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,779 | $0 | Implemented |
UW2308 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,223 | $0 | Implemented |
UW2308 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $491 | $1,096 | Implemented |
UW2308 # 03 Y:2023 | 03 | 2023 | INSTALL STORM WINDOWS AND DOORS | $145 | $1,901 | Implemented |
UW2308 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $206 | $1,815 | Implemented |
UW2308 # 05 Y:2023 | 05 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $47,887 | $200,000 | Implemented |
UW2308 # 06 Y:2023 | 06 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $36,635 | $0 | Implemented |
UL2305 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,322 | $500 | Implemented |