IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67,054

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0957 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,973 $8,747 Implemented
OK0957 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,059 $52,806 Implemented
MZ0217 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,739 $80,500 Implemented
MZ0217 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $6,607 $3,000 Implemented
MZ0217 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $841 $1,100 Implemented
MZ0218 # 02 Y:2016 02 2016 USE PHOTOCELL CONTROLS $2,869 $490 Implemented
MZ0218 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,572 $10,350 Implemented
MZ0218 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $2,293 $900 Implemented
MZ0218 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $1,603 $900 Implemented
DL0171 # 03 Y:2016 03 2016 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $374 $0 Implemented
DL0171 # 07 Y:2016 07 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,885 $0 Implemented
DL0171 # 12 Y:2016 12 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $4,030 $0 Implemented
WM0099 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $358 $120 Implemented
WM0099 # 11 Y:2016 11 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $344 $0 Implemented
WM0099 # 12 Y:2016 12 2016 INSULATE BARE EQUIPMENT $274 $315 Implemented
TT0182 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,055 $53,270 Implemented
TT0182 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,314 $4,000 Implemented
TT0182 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,956 $5,000 Implemented
TT0182 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $6,416 $19,000 Implemented
TT0182 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,822 $1,500 Implemented
TT0182 # 09 Y:2016 09 2016 INSTALL TIMERS AND/OR THERMOSTATS $1,612 $500 Implemented
TT0182 # 10 Y:2016 10 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $836 $600 Implemented
SU0431 # 01 Y:2016 01 2016 DISCONNECT BALLASTS $270 $0 Implemented
SU0431 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,312 $0 Implemented
SU0431 # 03 Y:2016 03 2016 INSULATE FEEDWATER TANK $162 $56 Implemented