IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68,681

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1094 # 03 Y:2024 03 2024 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $342 $20,000 Implemented
NT0034 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $131 $414 Implemented
NT0034 # 05 Y:2024 05 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,461 $1,258 Implemented
WV0670 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,506 $770 Implemented
WV0670 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,211 $1,154 Implemented
WV0670 # 08 Y:2024 08 2024 DEVELOP A REPAIR/REPLACE POLICY $1,123 $1,296 Implemented
WV0670 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $878 $581 Implemented
WV0670 # 10 Y:2024 10 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $666 $148 Implemented
WV0670 # 11 Y:2024 11 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $237 $1,029 Implemented
WV0673 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $6,139 $11,569 Implemented
WV0673 # 04 Y:2024 04 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,359 $6,620 Implemented
WV0673 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $4,399 $2,317 Implemented
WV0673 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,382 $16,575 Implemented
WV0673 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $560 Implemented
WV0673 # 11 Y:2024 11 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $470 $887 Implemented
WV0673 # 12 Y:2024 12 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $179 $80 Implemented
UU0258 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $25,800 $6,200 Implemented
UU0258 # 03 Y:2024 03 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $12,600 $54,500 Implemented
UU0258 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,890 $11,500 Implemented
UU0258 # 07 Y:2024 07 2024 OPTIMIZE PLANT POWER FACTOR $120,000 $198,000 Implemented
UU0261 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $22,296 $572,100 Implemented
UU0261 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,063 $9,140 Implemented
UU0261 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,386 $8,280 Implemented
UW2414 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $141 $220 Implemented
UW2414 # 03 Y:2024 03 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $812 $1,219 Implemented