IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,302

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0358 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,312 $6,320 Implemented
LL0358 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $15,407 $440 Implemented
LL0358 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,716 $45 Implemented
OK0817 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,438 $510 Implemented
OK0817 # 07 Y:2011 07 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,011 $23,400 Implemented
OK0817 # 10 Y:2011 10 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,371 $0 Implemented
IA0473 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,500 $105 Implemented
IA0473 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,238 $4,669 Implemented
IA0473 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $615 $1,273 Implemented
SF0404 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,243 $0 Implemented
SF0404 # 03 Y:2011 03 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $257 $22 Implemented
SF0404 # 04 Y:2011 04 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $17,934 $5,426 Implemented
SF0404 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $697 $1,356 Implemented
SF0404 # 10 Y:2011 10 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $676 $1,569 Implemented
TT0080 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,663 $100 Implemented
MI0213 # 02 Y:2011 02 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,640 $1,300 Implemented
MI0213 # 06 Y:2011 06 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,430 $1,860 Implemented
MI0213 # 08 Y:2011 08 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $747 $900 Implemented
MA0684 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $23,122 $40,000 Implemented
MA0684 # 02 Y:2011 02 2011 REDUCE VENTILATION AIR $14,891 $3,700 Implemented
MA0684 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,358 $15,000 Implemented
MA0684 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $2,502 $2,200 Implemented
MA0684 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $1,402 $2,100 Implemented
NC0440 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $157,713 $165,618 Implemented
NC0440 # 02 Y:2011 02 2011 DEVELOP A REPAIR/REPLACE POLICY $15,127 $20,158 Implemented