IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,610

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0355 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,150 $1,655 Implemented
WM0038 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,700 $16,042 Implemented
WM0038 # 02 Y:2014 02 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $172 $73 Implemented
WM0038 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,678 $1,768 Implemented
WM0038 # 04 Y:2014 04 2014 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $622 $500 Implemented
WM0038 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $637 $1,519 Implemented
WM0038 # 09 Y:2014 09 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $149 $460 Implemented
BD0441 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $3,813 $2,600 Implemented
BD0441 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $300 $280 Implemented
BD0441 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,765 $3,000 Implemented
BS0027 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,592 $3,814 Implemented
BS0027 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $487 $168 Implemented
BS0027 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $253 $12,282 Implemented
BS0027 # 05 Y:2014 05 2014 REPAIR OR REPLACE STEAM TRAPS $37,433 $17,740 Implemented
BS0027 # 06 Y:2014 06 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,276 $320 Implemented
NC0506 # 01 Y:2014 01 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,335 $3,500 Implemented
NC0506 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,235 $880 Implemented
NC0506 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,931 $25,335 Implemented
NC0506 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,747 $8,956 Implemented
NC0506 # 09 Y:2014 09 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $505 $766 Implemented
NC0506 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $1,360 $4,256 Implemented
MA0722 # 01 Y:2014 01 2014 USE POWER DURING OFF-PEAK PERIODS $11,298 $500 Implemented
MA0722 # 08 Y:2014 08 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $998 $200 Implemented
LE0370 # 01 Y:2014 01 2014 INSTALL TIMERS AND/OR THERMOSTATS $3,349 $0 Implemented
LE0370 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,947 $35 Implemented