IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,770

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0389 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,547 $4,500 Implemented
LE0389 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $642 $1,000 Implemented
LE0389 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,458 $81,373 Implemented
MI0271 # 06 Y:2015 06 2015 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $4,265 $11,000 Implemented
MI0271 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $4,590 Implemented
MI0271 # 11 Y:2015 11 2015 INSTALL OCCUPANCY SENSORS $956 $373 Implemented
MA0742 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $38,357 $25,972 Implemented
MA0742 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $24,583 $5,560 Implemented
MA0742 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,116 $9,000 Implemented
MA0742 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,465 $11,685 Implemented
MA0742 # 08 Y:2015 08 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,024 $11,650 Implemented
AM0674 # 03 Y:2015 03 2015 REPAIR OR REPLACE STEAM TRAPS $2,350 $440 Implemented
AM0674 # 05 Y:2015 05 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,185 $500 Implemented
AM0674 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $550 $275 Implemented
LE0390 # 06 Y:2015 06 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $47,479 $25,500 Implemented
UA0133 # 01 Y:2015 01 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,351 $1,728 Implemented
UA0133 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,902 $13,479 Implemented
UA0133 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,236 $783 Implemented
UA0133 # 05 Y:2015 05 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,308 $10,240 Implemented
UA0133 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,161 $2,500 Implemented
UA0133 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,421 $50 Implemented
UA0133 # 09 Y:2015 09 2015 INSTALL TIMERS AND/OR THERMOSTATS $2,180 $0 Implemented
UA0133 # 10 Y:2015 10 2015 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,848 $2,636 Implemented
MZ0166 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,360 $6,500 Implemented
MZ0166 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $119 $180 Implemented