IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,519

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2310 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,694 $540 n/a
UL2310 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $550 $2,438 n/a
UF0601 # 01 Y:2023 01 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,858,540 $0 Not Implemented
UF0601 # 02 Y:2023 02 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,202,647 $3,920,000 Implemented
UF0601 # 03 Y:2023 03 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $280,640 $30,000 Implemented
UF0601 # 04 Y:2023 04 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $32,141 $49,680 Implemented
UF0601 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,983 $0 Implemented
LS1723 # 01 Y:2023 01 2023 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $12,310 $0 Implemented
LS1723 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,341 $0 Implemented
LS1723 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $251 $0 Implemented
LS1723 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $817 $350 Not Implemented
LS1723 # 05 Y:2023 05 2023 REDUCE HEAT GAIN BY WINDOW TINTING $2,045 $2,688 Implemented
LS1723 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,787 $15,377 Implemented
LS1723 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $43,453 $429,000 Not Implemented
IP7004 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $258 $393 n/a
IP7004 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,397 $145,038 n/a
IP7004 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,102 $6,849 n/a
UW2313 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,760 $2,080 Implemented
UW2313 # 03 Y:2023 03 2023 UPGRADE OBSOLETE EQUIPMENT $2,813 $10,637 Implemented
TT0302 # 01 Y:2023 01 2023 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $141,741 $909,720 n/a
TT0302 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $61,184 $15,000 n/a
TT0302 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,359 $90,000 n/a
TT0302 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,127 $1,500 n/a
TT0302 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,886 $0 n/a
TT0302 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,990 $20,000 n/a