IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,846

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0316 # 06 Y:2012 06 2012 OPTIMIZE PLANT POWER FACTOR $4,286 $10,841 Not Implemented
SU0316 # 07 Y:2012 07 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $244 $711 Not Implemented
SU0316 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $179 $760 Not Implemented
SU0316 # 09 Y:2012 09 2012 UPGRADE OBSOLETE EQUIPMENT $145 $703 Not Implemented
SU0316 # 10 Y:2012 10 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $48,724 $900,000 Not Implemented
TT0084 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,296 $6,000 Not Implemented
TT0084 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,912 $3,000 Not Implemented
TT0084 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,245 $3,500 Not Implemented
TT0084 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,391 $15,000 Not Implemented
TT0084 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,504 $4,500 Not Implemented
TT0084 # 06 Y:2012 06 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $115 $10 Implemented
TT0084 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $216 $2,128 Not Implemented
TT0084 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,819 $6,000 Not Implemented
TT0084 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,757 $45,510 Not Implemented
TT0084 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,284 $6,653 Not Implemented
UM0399 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $5,760 $200 Implemented
UM0399 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,275 $1,300 Implemented
UM0399 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $1,000 Implemented
UM0399 # 04 Y:2012 04 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,480 $3,200 Implemented
UM0399 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,010 $15,800 Implemented
UM0399 # 06 Y:2012 06 2012 REDUCE VENTILATION AIR $11,000 $10,000 Implemented
UA0074 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,718 $480 Implemented
UA0074 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,736 $2,500 Implemented
UA0074 # 03 Y:2012 03 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,094 $1,680 Not Implemented
UA0074 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,815 $539 Not Implemented