IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,544

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0888 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,100 $4,040 Implemented
AM0888 # 08 Y:2023 08 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $895 $0 Implemented
AM0888 # 09 Y:2023 09 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $830 $734 Not Implemented
AM0888 # 10 Y:2023 10 2023 USE SYNTHETIC LUBRICANT $430 $230 Not Implemented
AM0888 # 11 Y:2023 11 2023 INSTALL OCCUPANCY SENSORS $235 $550 Implemented
UW2310 # 01 Y:2023 01 2023 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $29,254 $128,809 Not Implemented
UW2310 # 02 Y:2023 02 2023 UPGRADE OBSOLETE EQUIPMENT $153,154 $859,050 Not Implemented
UW2310 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,425 $1,000 Implemented
UW2310 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,210 $16,378 Implemented
IC0289 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,395 $19,066 Implemented
IC0289 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $9,069 $7,303 Implemented
IC0289 # 03 Y:2023 03 2023 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,672 $0 Not Implemented
IC0289 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $43,347 $366,628 Not Implemented
IC0289 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $21,396 $151,345 Not Implemented
NL0087 # 01 Y:2023 01 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $491,419 $1,990,800 n/a
NL0087 # 02 Y:2023 02 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $254,315 $454,461 n/a
NL0087 # 03 Y:2023 03 2023 REPAIR OR REPLACE STEAM TRAPS $17,666 $50 n/a
NL0087 # 04 Y:2023 04 2023 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $12,625 $8,000 n/a
NL0087 # 05 Y:2023 05 2023 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $11,616 $7,640 n/a
NL0087 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,789 $100 n/a
NL0087 # 08 Y:2023 08 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,019 $768 n/a
SF0607 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $6,168 $0 n/a
SF0607 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,963 $344 n/a
SF0607 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,399 $8,086 n/a
SF0607 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,524 $11,610 n/a