IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,574

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2307 # 05 Y:2023 05 2023 UPGRADE OBSOLETE EQUIPMENT $878,493 $1,900,000 Implemented
UA0271 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $925 $377 n/a
UA0271 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,935 $24,359 n/a
UA0271 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $66,296 $2,275 n/a
UA0271 # 04 Y:2023 04 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,447 $13,906 n/a
UA0271 # 05 Y:2023 05 2023 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $122 $65 n/a
KS2318 # 01 Y:2023 01 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $14,419 $320 n/a
KS2318 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,203 $60 n/a
KS2318 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,814 $28,960 n/a
KS2318 # 04 Y:2023 04 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,238 $1,864 n/a
KS2318 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $224 $765 n/a
KS2318 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,448 $8,951 n/a
KS2318 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $43,077 $421,486 n/a
UL2303 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $43,641 $26,163 Not Implemented
UL2303 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,504 $0 Not Implemented
UL2303 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,439 $34,126 Not Implemented
UL2303 # 04 Y:2023 04 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,140 $7,650 Not Implemented
UL2303 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $36,831 $336,395 Not Implemented
UL2303 # 06 Y:2023 06 2023 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $7,161 $21,450 Not Implemented
UL2303 # 07 Y:2023 07 2023 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $6,194 $25,900 Not Implemented
WV0645 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,119 $24,727 Not Implemented
WV0645 # 02 Y:2023 02 2023 INSTALL SET-BACK TIMERS $1,981 $1,274 Implemented
WV0645 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $1,083 $5,364 Not Implemented
WV0645 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $835 $218 Implemented
WV0645 # 05 Y:2023 05 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $751 $3,668 Not Implemented