IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147,999

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1072 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,741 $5,000 Implemented
UD1072 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $3,199 $864 Implemented
UD1072 # 03 Y:2024 03 2024 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $63 $216 Implemented
UD1072 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,454 $952 Not Implemented
UD1072 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,892 $12,650 Implemented
UD1072 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $1,343 $1,667 Not Implemented
UD1072 # 07 Y:2024 07 2024 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $14,674 $67,830 Not Implemented
UF0606 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $188,564 $146,067 Implemented
UF0606 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $65,322 $322,608 Implemented
UF0606 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $38,799 $79,800 Implemented
UF0606 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $35,430 $25,350 Implemented
UF0606 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,283 $0 Implemented
UL2315 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $19,703 $150,942 Not Implemented
UL2315 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,783 $12,225 Not Implemented
UL2315 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,528 $1,620 Not Implemented
UL2315 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,612 $8,564 Not Implemented
UL2315 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $2,583 $1,264 Not Implemented
UL2315 # 06 Y:2023 06 2023 RECOVER WASTE HEAT FROM EQUIPMENT $8,527 $31,200 Not Implemented
LS2401 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,640 $180 Implemented
LS2401 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,761 $100 Implemented
LS2401 # 03 Y:2024 03 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,301 $100 Implemented
LS2401 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $370 $75 Implemented
LS2401 # 05 Y:2024 05 2024 INSTALL WIND POWERED ELECTRIC GENERATOR $452,959 $1,680,000 Implemented
LS2401 # 06 Y:2024 06 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,633 $42,000 Implemented
SF0612 # 01 Y:2024 01 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,332 $226 Implemented