IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,760

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0389 # 07 Y:2021 07 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,000 $480 Not Implemented
MI0389 # 08 Y:2021 08 2021 USE COMPRESSOR AIR FILTERS $1,420 $1,100 Implemented
MI0389 # 09 Y:2021 09 2021 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,362 $616 Implemented
MI0389 # 10 Y:2021 10 2021 COMBINE UTILITY METERS $776 $240 Not Implemented
SU0506 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,730 $0 Not Implemented
SU0506 # 02 Y:2021 02 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $673 $100 Implemented
SU0506 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,987 $2,215 Implemented
SU0506 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $496 $365 Implemented
UF0565 # 01 Y:2021 01 2021 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $124,268 $90,000 Not Implemented
UF0565 # 02 Y:2021 02 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $120,536 $84,600 Not Implemented
UF0565 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $52,797 $9,223 Not Implemented
UF0565 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,569 $48,945 Implemented
UF0565 # 05 Y:2021 05 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $29,289 $0 Not Implemented
UF0565 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $2,587 $12,332 Implemented
UF0565 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,574 $0 Implemented
UK2104 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,514 $444 n/a
UK2104 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,021 $2,633 n/a
UK2104 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $231 $650 n/a
UK2104 # 04 Y:2021 04 2021 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $85 $285 n/a
UK2104 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $26,160 $9,000 n/a
UK2104 # 06 Y:2021 06 2021 REDESIGN PROCESS $16,187 $25,000 n/a
UK2104 # 08 Y:2021 08 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $21,003 $0 n/a
UK2104 # 10 Y:2021 10 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $356 $78 n/a
AM0825 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,860 $5,000 Implemented
AM0825 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $8,900 $0 Not Implemented