IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142,967

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0992 # 02 Y:2018 02 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $48,158 $1,000 Not Implemented
UD0992 # 03 Y:2018 03 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $30,337 $32,600 Not Implemented
UD0992 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $11,815 $0 Not Implemented
UD0992 # 05 Y:2018 05 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,174 $9,900 Not Implemented
MI0343 # 01 Y:2018 01 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $236,442 $800,000 Implemented
MI0343 # 02 Y:2018 02 2018 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $37,140 $43,838 Not Implemented
MI0343 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,079 $2,030 Implemented
MI0343 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $30,500 $3,280 Implemented
MI0343 # 05 Y:2018 05 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,400 $71,328 Implemented
MI0343 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,044 $2,973 Not Implemented
MI0343 # 07 Y:2018 07 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,421 $1,005 Not Implemented
MI0343 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,552 $7,675 Implemented
MI0343 # 09 Y:2018 09 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,896 $6,486 Implemented
AM0763 # 02 Y:2018 02 2018 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $515,700 $2,200,000 Not Implemented
AM0763 # 03 Y:2018 03 2018 OPTIMIZE PLANT POWER FACTOR $105,400 $136,400 Implemented
AM0763 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $98,130 $20,000 Implemented
AM0763 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,730 $42,230 Implemented
AM0763 # 07 Y:2018 07 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $38,500 $400 Not Implemented
AM0763 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,600 $37,900 Implemented
AM0763 # 09 Y:2018 09 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,640 $7,720 Implemented
AS0460 # 01 Y:2018 01 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,076 $47,006 Not Implemented
AS0460 # 02 Y:2018 02 2018 REPAIR AND ELIMINATE STEAM LEAKS $1,542 $300 Implemented
AS0460 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $542 $1,624 Implemented
AS0460 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $190 $375 Implemented
LE0462 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,915 $1,000 Implemented