IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,386

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0105 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $3,860 $0 Not Implemented
OK0331 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $382 $252 Implemented
KU0330 # 01 Y:1990 01 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,058 $490 Not Implemented
MA0200 # 02 Y:1990 02 1990 REPAIR OR REPLACE STEAM TRAPS $4,450 $2,880 Implemented
AM0105 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $180 $170 Implemented
MA0199 # 06 Y:1990 06 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,992 $21,942 Not Implemented
AM0105 # 06 Y:1990 06 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,800 $400 Implemented
AM0105 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $7,790 $21,500 Implemented
KU0330 # 02 Y:1990 02 1990 TURN OFF EQUIPMENT WHEN NOT IN USE $5,368 $3,600 Not Implemented
CO0200 # 07 Y:1990 07 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $540 $1,800 Not Implemented
MA0200 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,023 $15,974 Implemented
AM0105 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,600 $500 Implemented
CO0200 # 05 Y:1990 05 1990 RECOVER WASTE HEAT FROM EQUIPMENT $950 $2,000 Not Implemented
OK0332 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98 $102 Implemented
AM0105 # 04 Y:1990 04 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,000 $0 Implemented
CO0200 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,570 $320 Not Implemented
AM0105 # 01 Y:1990 01 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,500 $27,000 Not Implemented
OK0331 # 01 Y:1990 01 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,171 $0 Implemented
MA0200 # 01 Y:1990 01 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $45,965 $47,912 Implemented
OK0331 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,918 $3,000 Not Implemented
KU0330 # 03 Y:1990 03 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,198 $0 Implemented
CO0200 # 08 Y:1990 08 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $700 Not Implemented
WI0105 # 11 Y:1990 11 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $213 $0 Implemented
CO0200 # 01 Y:1990 01 1990 INSTALL TIMERS AND/OR THERMOSTATS $4,200 $2,250 Not Implemented
MA0199 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $147 $118 Not Implemented