IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,843

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0402 # 02 Y:1997 02 1997 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,200 $2,920 Not Implemented
CO0402 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $635 $995 Not Implemented
KG0100 # 01 Y:1997 01 1997 LOWER CEILING TO REDUCE CONDITIONED SPACE $1,133 $248 n/a
KG0100 # 02 Y:1997 02 1997 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,859 $1,744 n/a
KU0485 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $230 $40 Not Implemented
KU0485 # 03 Y:1997 03 1997 INSULATE BARE EQUIPMENT $470 $300 Implemented
KU0485 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $660 Implemented
KU0485 # 01 Y:1997 01 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,310 $190 Implemented
MA0405 # 08 Y:1997 08 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $531 $600 Not Implemented
MA0405 # 06 Y:1997 06 1997 INSTALL OCCUPANCY SENSORS $1,335 $1,620 Implemented
MA0405 # 05 Y:1997 05 1997 OPTIMIZE PLANT POWER FACTOR $2,412 $5,275 Not Implemented
MA0405 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,631 $266 Not Implemented
MA0405 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,177 $28,900 Implemented
MA0405 # 01 Y:1997 01 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $110,455 $131,100 Not Implemented
AR0130 # 05 Y:1997 05 1997 DISCONNECT BALLASTS $1,409 $1,409 Implemented
AR0130 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $100 $1,260 Implemented
AR0130 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $312 $0 Not Implemented
AR0130 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,164 $400 Not Implemented
AR0130 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,683 $730 Implemented
CO0401 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $165 $96 Not Implemented
CO0401 # 01 Y:1997 01 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $780 $0 Not Implemented
UF0189 # 01 Y:1997 01 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,371 $315 Not Implemented
UF0189 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $6,181 $4,416 Not Implemented
UF0189 # 03 Y:1997 03 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $425 $800 Not Implemented
UF0189 # 04 Y:1997 04 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,074 $74,230 Not Implemented