IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,820

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0559 # 09 Y:1998 09 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,288 $0 Implemented
WV0155 # 07 Y:1998 07 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $712 $670 Implemented
WV0155 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,598 $1,280 Implemented
WV0155 # 05 Y:1998 05 1998 INSULATE BARE EQUIPMENT $24,472 $4,450 Implemented
WV0155 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,575 $289 Not Implemented
WV0155 # 03 Y:1998 03 1998 BURN A LESS EXPENSIVE GRADE OF FUEL $8,776 $10,800 Not Implemented
WV0155 # 02 Y:1998 02 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,108 $4,432 Not Implemented
WV0155 # 01 Y:1998 01 1998 REDUCE VENTILATION AIR $1,704 $708 Implemented
MS0119 # 01 Y:1998 01 1998 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $24,225 $7,315 Not Implemented
MS0119 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,424 $21,311 Not Implemented
MS0119 # 03 Y:1998 03 1998 USE SYNTHETIC LUBRICANT $1,266 $440 Implemented
MS0119 # 04 Y:1998 04 1998 USE DEMAND CONTROLLER OR LOAD SHEDDER $32,240 $31,500 Implemented
MS0119 # 05 Y:1998 05 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $109,983 $0 Implemented
MS0120 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,885 $881 Implemented
MS0120 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $12,972 $5,703 Implemented
MS0120 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,002 $5,805 Not Implemented
MS0120 # 04 Y:1998 04 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,888 $6,000 Not Implemented
MS0120 # 05 Y:1998 05 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,417 $1,000 Implemented
MS0120 # 06 Y:1998 06 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,664 $270 Implemented
MS0120 # 07 Y:1998 07 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,987 $1,424 Implemented
MS0120 # 08 Y:1998 08 1998 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $15,436 $142,800 Not Implemented
MS0120 # 09 Y:1998 09 1998 OPERATE BOILERS ON HIGH FIRE SETTING $37,680 $0 Not Implemented
UF0213 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,516 $16,781 Implemented
UF0213 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,297 $5,022 Implemented
UF0213 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,712 $6,927 Not Implemented