IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,615

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0678 # 07 Y:1999 07 1999 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $44,185 $120,000 Not Implemented
GT0678 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,880 $3,500 Not Implemented
TN0650 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,400 $0 Implemented
TN0650 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $6,220 $2,180 Not Implemented
UF0239 # 02 Y:1999 02 1999 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,096 $0 Implemented
TN0650 # 05 Y:1999 05 1999 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $6,350 $36,000 Not Implemented
TN0650 # 08 Y:1999 08 1999 USE MINIMUM STEAM OPERATING PRESSURE $5,280 $0 Not Implemented
UF0239 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,938 $0 Not Implemented
TN0650 # 09 Y:1999 09 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,555 $1,120 Not Implemented
TN0666 # 12 Y:1999 12 1999 BURN A LESS EXPENSIVE GRADE OF FUEL $4,100 $5,620 Not Implemented
TN0666 # 06 Y:1999 06 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,640 $4,620 Implemented
TN0666 # 10 Y:1999 10 1999 USE SYNTHETIC LUBRICANT $900 $0 Implemented
TN0666 # 11 Y:1999 11 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $560 $1,200 Implemented
TN0666 # 09 Y:1999 09 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,120 $1,460 Implemented
TN0666 # 07 Y:1999 07 1999 INSTALL SKYLIGHTS $2,460 $5,070 Not Implemented
TN0666 # 03 Y:1999 03 1999 INSTALL TIMERS AND/OR THERMOSTATS $12,160 $3,250 Implemented
MA0455 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,701 $16,000 Not Implemented
MA0455 # 05 Y:1999 05 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,122 $8,000 Not Implemented
MA0455 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,310 $50,000 Not Implemented
MA0455 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $93,496 $240,000 Not Implemented
MA0455 # 02 Y:1999 02 1999 USE MINIMUM SAFE OVEN VENTILATION $33,134 $16,250 Not Implemented
BD0148 # 05 Y:1999 05 1999 INSTALL OCCUPANCY SENSORS $945 $1,350 n/a
BD0148 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,112 $0 n/a
BD0148 # 06 Y:1999 06 1999 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $653 $644 n/a
BD0148 # 02 Y:1999 02 1999 USE POWER DURING OFF-PEAK PERIODS $9,788 $1,000 n/a