IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,655

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0385 # 03 Y:2000 03 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $7,231 $600 Implemented
OR0385 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,053 $0 Not Implemented
OR0385 # 05 Y:2000 05 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,380 $0 Implemented
OR0385 # 06 Y:2000 06 2000 OPTIMIZE PLANT POWER FACTOR $670 $1,900 Not Implemented
OR0385 # 07 Y:2000 07 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,638 $10,431 Implemented
OR0384 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $543 $500 Implemented
OR0384 # 03 Y:2000 03 2000 UPGRADE CONTROLS ON COMPRESSORS $6,605 $13,210 Not Implemented
OR0384 # 04 Y:2000 04 2000 OPTIMIZE PLANT POWER FACTOR $3,240 $9,000 Implemented
OR0384 # 05 Y:2000 05 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,316 $0 Not Implemented
OR0384 # 06 Y:2000 06 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,764 $24,310 Implemented
IA0262 # 01 Y:2000 01 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,355 $10,000 Not Implemented
IA0262 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,228 $0 Not Implemented
IA0262 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,048 $0 Implemented
IA0262 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $875 $125 Not Implemented
IA0262 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $788 $221 Implemented
IA0262 # 06 Y:2000 06 2000 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $522 $640 Implemented
IA0262 # 07 Y:2000 07 2000 INSTALL OCCUPANCY SENSORS $550 $1,397 Not Implemented
GT0703 # 01 Y:2000 01 2000 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $2,459 $0 Not Implemented
GT0703 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,855 $30,000 Implemented
GT0703 # 05 Y:2000 05 2000 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $17,878 $40,000 Not Implemented
GT0703 # 06 Y:2000 06 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,968 $0 Not Implemented
GT0703 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,031 $0 Not Implemented
MA0476 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $109,000 $720,000 Not Implemented
MA0476 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,750 $50,000 Not Implemented
MA0476 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,100 $24,000 Implemented