IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,575

matching recommendations
Reset
ARC 2 ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0809 # 01 Y:2009 01 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $22,565 $5,640 Implemented
AM0567 # 01 Y:2009 01 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,925 $1,020 Not Implemented
AM0567 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,035 $20 Not Implemented
AM0567 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $305 Implemented
SD0422 # 01 Y:2009 01 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $31,588 $0 Implemented
SD0422 # 02 Y:2009 02 2009 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,480 $0 Implemented
SD0422 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,840 $2,200 Implemented
SD0422 # 04 Y:2009 04 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,765 $2,554 Not Implemented
SD0422 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,451 $4,146 Implemented
UF0428 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,365 $0 Implemented
UF0428 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,980 $5,895 Implemented
UF0428 # 04 Y:2009 04 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,371 $2,260 Not Implemented
UF0428 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $872 $1,971 Implemented
UF0428 # 06 Y:2009 06 2009 INSTALL COMMON HEADER ON COMPRESSORS $674 $0 Not Implemented
UF0428 # 07 Y:2009 07 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,285 $0 Implemented
UF0428 # 08 Y:2009 08 2009 OPTIMIZE PLANT POWER FACTOR $44,818 $3,326 Not Implemented
UF0428 # 09 Y:2009 09 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $25,086 $0 Implemented
CO0630 # 05 Y:2009 05 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $1,830 $10,599 Not Implemented
CO0630 # 04 Y:2009 04 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,070 $9,010 Not Implemented
CO0630 # 03 Y:2009 03 2009 USE OPTIMUM THICKNESS INSULATION $8,920 $12,000 Not Implemented
CO0630 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,410 $2,000 Not Implemented
CO0630 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,380 $46,700 Not Implemented
AM0566 # 01 Y:2009 01 2009 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $59,200 $0 Not Implemented
AM0566 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,230 $111,190 Implemented
AM0566 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $35,170 $1,300 Implemented