IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66,787

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0007 # 05 Y:1984 05 1984 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,694 $50 Implemented
UD0141 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $10,040 $7,500 Implemented
UD0141 # 04 Y:1984 04 1984 TURN OFF EQUIPMENT WHEN NOT IN USE $9,326 $400 Implemented
UD0142 # 02 Y:1984 02 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,060 $10,000 Implemented
UD0142 # 03 Y:1984 03 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,810 $384 Implemented
UD0143 # 01 Y:1984 01 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,182 $0 Implemented
UD0143 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $2,369 $2,500 Implemented
UD0143 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,542 $387 Implemented
MA0005 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $553 $62 Implemented
MA0005 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $314 $0 Implemented
MA0005 # 03 Y:1984 03 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,993 $200 Implemented
MA0005 # 05 Y:1984 05 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $22,212 $0 Implemented
MA0008 # 01 Y:1984 01 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $79 $0 Implemented
MA0008 # 04 Y:1984 04 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $623 $1,079 Implemented
MA0009 # 02 Y:1984 02 1984 INSTALL SET-BACK TIMERS $1,183 $200 Implemented
MA0009 # 03 Y:1984 03 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $100 $0 Implemented
LT0009 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,320 $1,750 Implemented
LT0009 # 02 Y:1984 02 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,020 $0 Implemented
LT0012 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $2,100 $2,958 Implemented
LT0012 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $102 $160 Implemented
LT0012 # 05 Y:1984 05 1984 INSTALL TIMERS AND/OR THERMOSTATS $4,638 $186 Implemented
LT0012 # 06 Y:1984 06 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $1,400 Implemented
LT0013 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,540 $0 Implemented
LT0013 # 02 Y:1984 02 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $425 $561 Implemented
LT0013 # 03 Y:1984 03 1984 COVER OPEN TANKS $11,045 $3,631 Implemented