Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
67,027
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0601 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,700 | $12,525 | Implemented |
SF0600 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $738 | $50 | Implemented |
SF0600 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $50,839 | $316,988 | Implemented |
TT0294 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,944 | $43,883 | Implemented |
TT0294 # 03 Y:2023 | 03 | 2023 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $14,815 | $12,000 | Implemented |
TT0294 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,950 | $3,100 | Implemented |
TT0294 # 06 Y:2023 | 06 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,671 | $500 | Implemented |
TT0294 # 08 Y:2023 | 08 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,236 | $7,500 | Implemented |
TT0294 # 10 Y:2023 | 10 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $974 | $500 | Implemented |
TT0294 # 11 Y:2023 | 11 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $88 | $100 | Implemented |
OR0770 # 01 Y:2023 | 01 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,142 | $6,704 | Implemented |
OR0770 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,249 | $9,000 | Implemented |
UU0220 # 01 Y:2023 | 01 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $67,069 | $0 | Implemented |
UU0220 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,986 | $13,500 | Implemented |
UU0220 # 05 Y:2023 | 05 | 2023 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,160 | $50 | Implemented |
UU0220 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $920 | $1,200 | Implemented |
KS2316 # 01 Y:2023 | 01 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $11,534 | $2,766 | Implemented |
KS2316 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,336 | $29,920 | Implemented |
KS2316 # 09 Y:2023 | 09 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $49,691 | $246,356 | Implemented |
KS2316 # 10 Y:2023 | 10 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $17,892 | $156,412 | Implemented |
IC0279 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $538 | $1,455 | Implemented |
IC0279 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $2,613 | $254 | Implemented |
IC0279 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,146 | $4,937 | Implemented |
IC0279 # 11 Y:2023 | 11 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $10,359 | $750 | Implemented |
OK1089 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,064 | $22,000 | Implemented |