IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,462

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0756 # 10 Y:2007 10 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,180 $12,000 Implemented
UD0756 # 12 Y:2007 12 2007 CHECK FOR ACCURACY OF UTILITY / POWER METERS $4,769 $0 Implemented
UD0756 # 13 Y:2007 13 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,160 $4,680 Implemented
UD0756 # 14 Y:2007 14 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $306 $150 Implemented
UF0397 # 01 Y:2007 01 2007 INSTALL SET-BACK TIMERS $504 $144 Implemented
UF0397 # 02 Y:2007 02 2007 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $5,429 $12,800 Implemented
UF0397 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,391 $590 Implemented
UF0397 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $189 $0 Implemented
UF0397 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,305 $6,526 Implemented
IC0125 # 04 Y:2007 04 2007 USE MINIMUM STEAM OPERATING PRESSURE $611 $0 Implemented
IC0125 # 07 Y:2007 07 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,485 $4,800 Implemented
IC0125 # 09 Y:2007 09 2007 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $52,577 $43,780 Implemented
IC0125 # 11 Y:2007 11 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,961 $16,278 Implemented
IC0125 # 12 Y:2007 12 2007 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,563 $0 Implemented
SU0250 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $696 $0 Implemented
SU0250 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $243 $0 Implemented
SU0250 # 04 Y:2007 04 2007 USE SYNTHETIC LUBRICANT $82 $0 Implemented
SU0250 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,654 $425 Implemented
SU0250 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,133 $587 Implemented
SU0250 # 09 Y:2007 09 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,604 $3,502 Implemented
SU0250 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $727 $519 Implemented
SU0250 # 11 Y:2007 11 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $38 $36 Implemented
SU0250 # 13 Y:2007 13 2007 INSTALL OCCUPANCY SENSORS $157 $321 Implemented
UD0755 # 01 Y:2007 01 2007 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $73,500 $147,000 Implemented
UD0755 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,728 $10,396 Implemented