IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67,027

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0964 # 04 Y:2023 04 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,786 $50,570 Implemented
UF0591 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $48,128 $44,635 Implemented
UF0591 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,481 $66,747 Implemented
UF0591 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,896 $8,591 Implemented
UF0591 # 05 Y:2023 05 2023 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $12,470 $19,320 Implemented
UF0591 # 06 Y:2023 06 2023 INSTALL SUB-METERING EQUIPMENT $2,168 $8,880 Implemented
UF0591 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,713 $0 Implemented
UW2301 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,523 $16,133 Implemented
UW2301 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $82 $344 Implemented
WV0638 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,432 $10,200 Implemented
WV0638 # 04 Y:2023 04 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,424 $11,600 Implemented
WV0638 # 06 Y:2023 06 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $674 $2,060 Implemented
WV0638 # 07 Y:2023 07 2023 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $631 $2,910 Implemented
WV0638 # 09 Y:2023 09 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $90 $100 Implemented
UD1053 # 05 Y:2023 05 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $288,790 $110,000 Implemented
UD1053 # 07 Y:2023 07 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,097 $110,000 Implemented
UD1053 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $7,370 $110,000 Implemented
MA0852 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $99,365 $854,943 Implemented
MA0852 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,591 $1,544 Implemented
AM0875 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $22,785 $7,000 Implemented
AM0875 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $1,130 $460 Implemented
AM0875 # 04 Y:2023 04 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,630 $4,160 Implemented
AM0875 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,920 $15 Implemented
AM0875 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $965 $15 Implemented
AM0875 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $925 $500 Implemented