IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,747

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0370 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,258 $39,378 Not Implemented
AS0370 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,336 $12,650 Not Implemented
AS0370 # 04 Y:2004 04 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,545 $16,000 Not Implemented
AS0370 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,794 $1,844 Not Implemented
AS0370 # 06 Y:2004 06 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,372 $5,500 Not Implemented
IC0075 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,225 $17,812 Not Implemented
IC0075 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,794 $12,470 Not Implemented
IC0075 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $4,538 $6,945 Not Implemented
IC0075 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $12,658 $3,832 Not Implemented
IC0075 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,066 $0 Not Implemented
IC0075 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,878 $6,154 Not Implemented
IC0075 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,105 $2,900 Implemented
LE0180 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $46,917 $0 Implemented
LE0180 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,802 $17,364 Not Implemented
LE0180 # 03 Y:2004 03 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,024 $2,200 Implemented
LE0180 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,020 $300 Implemented
LE0180 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,067 $1,200 Implemented
LE0180 # 06 Y:2004 06 2004 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $942 $550 Implemented
LE0180 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $903 $1,350 Not Implemented
GT0776 # 01 Y:2004 01 2004 CONTROL PRESSURE ON STEAMER OPERATIONS $1,335 $0 n/a
GT0776 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,581 $550 n/a
GT0776 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $330 $83 n/a
GT0776 # 04 Y:2004 04 2004 IMPROVE LUBRICATION PRACTICES $14,283 $0 n/a
GT0776 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,980 $13,020 n/a
GT0776 # 06 Y:2004 06 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $649 $530 n/a