Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
147,521
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0295 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,221 | $6,343 | Not Implemented |
IC0295 # 06 Y:2024 | 06 | 2024 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $16,247 | $16,893 | Not Implemented |
IC0295 # 07 Y:2024 | 07 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $843 | $490 | Implemented |
CC0031 # 01 Y:2023 | 01 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,780 | $15,000 | n/a |
CC0031 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,525 | $19,500 | n/a |
CC0031 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $34,115 | $205,795 | n/a |
CC0031 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $147 | $340 | n/a |
CC0031 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,751 | $0 | n/a |
CC0031 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,100 | $3,000 | n/a |
AS0567 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $100,430 | $774,239 | Implemented |
AS0567 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $57,803 | $10,720 | Not Implemented |
AS0567 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,255 | $31,926 | Not Implemented |
AS0567 # 05 Y:2023 | 05 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $647 | $384 | Not Implemented |
UL2316 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,992 | $0 | Implemented |
UL2316 # 02 Y:2023 | 02 | 2023 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $73,247 | $137,300 | Not Implemented |
UL2316 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $112,167 | $989,084 | Not Implemented |
UL2316 # 04 Y:2023 | 04 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,026 | $0 | Implemented |
UL2316 # 05 Y:2023 | 05 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $15,036 | $20,000 | Not Implemented |
UL2316 # 06 Y:2023 | 06 | 2023 | INSTALL HYDROGEN FUEL CELL | $281,388 | $1,750,000 | Not Implemented |
LE0557 # 01 Y:2024 | 01 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $279,544 | $0 | Implemented |
LE0557 # 02 Y:2024 | 02 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $87,150 | $3,000 | Not Implemented |
LE0557 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,494 | $100 | Implemented |
LE0557 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,783 | $9,500 | Not Implemented |
LE0557 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $197,906 | $323,780 | Implemented |
LE0557 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $291,977 | $600,000 | Not Implemented |