Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,571
matching recommendationsARC | 2. | ENERGY MANAGEMENT |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0958 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,461 | $2,000 | Implemented |
OK0958 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,735 | $9,149 | Implemented |
OK0958 # 12 Y:2016 | 12 | 2016 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,996 | $0 | Implemented |
OK0958 # 10 Y:2016 | 10 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24,151 | $70,000 | Implemented |
OK0958 # 09 Y:2016 | 09 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,455 | $0 | Implemented |
OK0958 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,623 | $520 | Not Implemented |
OK0958 # 05 Y:2016 | 05 | 2016 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,954 | $1,227 | Not Implemented |
OK0958 # 11 Y:2016 | 11 | 2016 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,955 | $100,000 | Implemented |
OK0958 # 13 Y:2016 | 13 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $309,693 | $1,927,657 | Not Implemented |
OK0958 # 03 Y:2016 | 03 | 2016 | REPAIR AND ELIMINATE STEAM LEAKS | $7,914 | $3,250 | Implemented |
OK0958 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,160 | $17,885 | Not Implemented |
OK0958 # 07 Y:2016 | 07 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,755 | $0 | Not Implemented |
OK0958 # 08 Y:2016 | 08 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $2,283 | $4,147 | Not Implemented |
MZ0218 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $1,603 | $900 | Implemented |
MZ0217 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $841 | $1,100 | Implemented |
MZ0218 # 05 Y:2016 | 05 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,810 | $0 | Not Implemented |
DL0171 # 05 Y:2016 | 05 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,572 | $11,400 | Not Implemented |
MZ0218 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $2,293 | $900 | Implemented |
MZ0217 # 06 Y:2016 | 06 | 2016 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $7,627 | $20,000 | Not Implemented |
OK0957 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,200 | $2,994 | Not Implemented |
DL0171 # 06 Y:2016 | 06 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,076 | $431 | Not Implemented |
DL0171 # 09 Y:2016 | 09 | 2016 | INSTALL AUTOMATIC STACK DAMPER | $624 | $205 | Not Implemented |
MZ0217 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $6,607 | $3,000 | Implemented |
DL0171 # 11 Y:2016 | 11 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,192 | $3,840 | Not Implemented |
DL0171 # 10 Y:2016 | 10 | 2016 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,505 | $1,524 | Not Implemented |