IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,046

matching recommendations
Reset
ARC 2. ENERGY MANAGEMENT
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0503 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,209 $21,960 Not Implemented
WI0503 # 03 Y:2005 03 2005 USE OPTIMUM THICKNESS INSULATION $8,005 $7,500 Not Implemented
WI0503 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,112 $1,000 Not Implemented
WI0503 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,506 $0 Not Implemented
WI0503 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,350 $640 Not Implemented
WI0503 # 07 Y:2005 07 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,742 $4,900 Not Implemented
SD0373 # 01 Y:2005 01 2005 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $34,083 $56,520 Not Implemented
SD0373 # 02 Y:2005 02 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,494 $3,900 Not Implemented
SD0373 # 03 Y:2005 03 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,208 $0 Not Implemented
SD0373 # 04 Y:2005 04 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,475 $450 Not Implemented
SD0373 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,918 $36,052 Not Implemented
SD0373 # 06 Y:2005 06 2005 USE PHOTOCELL CONTROLS $4,982 $615 Not Implemented
SD0373 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $3,212 $90 Not Implemented
CO0579 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,640 $300 Implemented
CO0579 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $526 $718 Implemented
CO0579 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,970 $400 Implemented
CO0579 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,140 $3,200 Not Implemented
CO0579 # 06 Y:2005 06 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $570 $230 Not Implemented
CO0579 # 07 Y:2005 07 2005 UPGRADE CONTROLS ON COMPRESSORS $280 $380 Implemented
CO0579 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,010 $11,780 Not Implemented
CO0579 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,840 $11,540 Not Implemented
CO0579 # 10 Y:2005 10 2005 USE SOLAR HEAT TO HEAT WATER $1,380 $5,220 Implemented
CO0579 # 11 Y:2005 11 2005 USE SOLAR HEAT TO HEAT MAKE-UP AIR $100 $850 Not Implemented
GT0814 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $39,400 $50,000 Not Implemented
GT0814 # 02 Y:2005 02 2005 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $235,000 $20,000 Not Implemented