IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

550

matching recommendations
Reset
ARC 2.7 Building and Grounds
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0015 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $963 $908 Implemented
KU0148 # 12 Y:1984 12 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,177 $17 Implemented
KU0148 # 09 Y:1984 09 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $298 $12 Implemented
KU0148 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,910 $36 Implemented
ST0009 # 10 Y:1984 10 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $370 $750 Not Implemented
KU0149 # 27 Y:1984 27 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,258 $906 Not Implemented
MA0012 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,078 $100 Implemented
MA0010 # 04 Y:1984 04 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,400 $6,300 Implemented
MA0010 # 03 Y:1984 03 1984 INSTALL TIMERS AND/OR THERMOSTATS $4,782 $1,260 Implemented
ST0009 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,275 $212 Not Implemented
CO0015 # 06 Y:1984 06 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $791 $230 Implemented
MA0010 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $712 $135 Implemented
CO0015 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $694 $1,127 Implemented
MA0010 # 07 Y:1984 07 1984 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $2,680 $8,130 Implemented
UD0147 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,487 $346 Implemented
KU0149 # 01 Y:1984 01 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $34,443 $3,262 Implemented
ST0009 # 09 Y:1984 09 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $679 $130 Not Implemented
CO0015 # 05 Y:1984 05 1984 INSTALL TIMERS AND/OR THERMOSTATS $5,808 $4,000 Not Implemented
CO0015 # 12 Y:1984 12 1984 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $1,237 $3,000 Not Implemented
CO0015 # 07 Y:1984 07 1984 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,240 $103 Not Implemented
KU0148 # 13 Y:1984 13 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,182 $2,000 Implemented
MA0011 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,985 $548 Implemented
ST0010 # 02 Y:1984 02 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,173 $0 Implemented
ST0009 # 08 Y:1984 08 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,149 $0 Implemented
KU0148 # 10 Y:1984 10 1984 REDUCE VENTILATION AIR $2,954 $500 Implemented