IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

106

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0643 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,900 $500 Implemented
AM0643 # 01 Y:2013 01 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $34,060 $250,000 Implemented
AM0643 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,370 $50 Implemented
AM0643 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $1,940 $235 Implemented
AM0642 # 10 Y:2013 10 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $171 $0 Implemented
AM0642 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $954 $2,680 Implemented
AM0641 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,894 $31,100 Implemented
AM0641 # 01 Y:2013 01 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $81,000 $40,000 Implemented
AM0641 # 02 Y:2013 02 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $45,620 $50,000 Implemented
AM0642 # 01 Y:2013 01 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,225 $0 Implemented
AM0641 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $4,800 $1,800 Implemented
AM0641 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,130 $610 Implemented
AM0641 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,580 $500 Implemented
AM0642 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,950 $560 Implemented
AM0642 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,645 $2,652 Implemented
AM0642 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,332 $636 Implemented
AM0642 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $500 Implemented
AM0642 # 07 Y:2013 07 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,220 $400 Implemented
AM0642 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $750 $9 Implemented
AM0640 # 24 Y:2013 24 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $405 $2,495 Implemented
AM0640 # 23 Y:2013 23 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $503 $10 Implemented
AM0640 # 17 Y:2013 17 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,378 $0 Implemented
AM0640 # 04 Y:2013 04 2013 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $15,124 $200,000 Implemented
AM0640 # 05 Y:2013 05 2013 REPLACE BOILER $14,187 $213,000 Implemented
AM0640 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,738 $10,800 Implemented