Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,391
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0212 # 12 Y:2002 | 12 | 2002 | MINIMIZE WATER USAGE | $219 | $1,000 | Not Implemented |
BD0212 # 13 Y:2002 | 13 | 2002 | INSTALL EQUIPMENT TO MOVE PRODUCT | $182,593 | $180,000 | n/a |
BD0212 # 14 Y:2002 | 14 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $59,860 | $35,000 | n/a |
BD0212 # 15 Y:2002 | 15 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $5,000 | $2,500 | Not Implemented |
BD0212 # 16 Y:2002 | 16 | 2002 | AUTOMATE PAYROLL SYSTEM | $3,016 | $2,495 | Not Implemented |
BD0211 # 01 Y:2002 | 01 | 2002 | USE RADIANT HEATER FOR SPOT HEATING | $20,195 | $31,000 | Implemented |
BD0211 # 02 Y:2002 | 02 | 2002 | INSTALL AUTOMATIC STACK DAMPER | $7,722 | $5,000 | Not Implemented |
BD0211 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $1,837 | $900 | Implemented |
BD0211 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,754 | $1,000 | Not Implemented |
BD0211 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,288 | $900 | Implemented |
BD0211 # 06 Y:2002 | 06 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $302 | $1,000 | Not Implemented |
BD0211 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $197 | $274 | Implemented |
BD0211 # 08 Y:2002 | 08 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $32,683 | $40,000 | Not Implemented |
BD0211 # 09 Y:2002 | 09 | 2002 | CLEAR AND RENT EXISTING SPACE | $7,500 | $1,000 | Not Implemented |
BD0210 # 01 Y:2002 | 01 | 2002 | USE RADIANT HEATER FOR SPOT HEATING | $4,813 | $9,000 | Implemented |
BD0210 # 02 Y:2002 | 02 | 2002 | ADD AREA LIGHTING SWITCHES | $3,792 | $2,700 | Implemented |
BD0210 # 03 Y:2002 | 03 | 2002 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $3,594 | $3,500 | Implemented |
BD0210 # 04 Y:2002 | 04 | 2002 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $703 | $2,500 | Not Implemented |
BD0210 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $516 | $750 | Implemented |
BD0210 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $439 | $1,200 | Implemented |
BD0210 # 07 Y:2002 | 07 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $422 | $500 | Implemented |
BD0210 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $-124 | $281 | Implemented |
BD0210 # 09 Y:2002 | 09 | 2002 | USE EVAPORATION TO CONCENTRATE MATERIAL | $406 | $1,200 | Implemented |
BD0210 # 10 Y:2002 | 10 | 2002 | MODIFY STARTUP/SHUTDOWN TIMES | $26,800 | $5,000 | Not Implemented |
BD0209 # 01 Y:2002 | 01 | 2002 | INSTALL OCCUPANCY SENSORS | $3,063 | $1,050 | Not Implemented |