IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,685

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0151 # 07 Y:2000 07 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $1,932 $8,000 Not Implemented
BD0142 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,333 $2,050 Implemented
BD0142 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $325 $675 Implemented
BD0142 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $141 $0 Implemented
BD0142 # 04 Y:1999 04 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $25,426 $5,000 Implemented
BD0142 # 05 Y:1999 05 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,238 $3,500 Not Implemented
BD0142 # 06 Y:1999 06 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,080 $6,500 Implemented
BD0150 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,594 $12,790 Implemented
BD0150 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,322 $6,908 Not Implemented
BD0150 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,905 $1,000 Implemented
BD0150 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $3,844 $3,750 Implemented
BD0150 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,726 $650 Implemented
BD0150 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $257 $310 Not Implemented
BD0150 # 07 Y:1999 07 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $26,208 $5,000 Implemented
BD0150 # 08 Y:1999 08 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $14,100 $7,200 Not Implemented
BD0150 # 09 Y:1999 09 1999 PAY BILLS ON TIME TO AVOID LATE FEES $426 $0 Implemented
BD0149 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,642 $22,260 n/a
BD0149 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,378 $2,060 n/a
BD0149 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $1,154 $1,125 n/a
BD0149 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,016 $1,250 n/a
BD0149 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $561 $0 n/a
BD0149 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $294 $350 n/a
BD0149 # 07 Y:1999 07 1999 CLEAR AND RENT EXISTING SPACE $56,400 $2,500 n/a
BD0149 # 08 Y:1999 08 1999 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $9,100 $0 n/a
BD0149 # 09 Y:1999 09 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $8,008 $10,000 n/a