IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,905

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0485 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $229,700 $118,560 Implemented
CO0485 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $27,060 $28,000 Implemented
CO0485 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $23,640 $18,000 Implemented
CO0485 # 07 Y:2001 07 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,600 $5,980 Implemented
CO0485 # 08 Y:2001 08 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,680 $8,380 Implemented
CO0485 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,370 $2,340 Implemented
CO0485 # 10 Y:2001 10 2001 AUTOMATE FINISHING PROCESS $112,750 $100,000 Implemented
CO0483 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,160 $0 Implemented
CO0483 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $0 Implemented
CO0483 # 04 Y:2001 04 2001 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,810 $4,730 Implemented
CO0482 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,100 $210 Implemented
CO0482 # 04 Y:2001 04 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $990 $370 Implemented
CO0482 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $60 Implemented
CO0481 # 02 Y:2001 02 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,370 $0 Implemented
CO0481 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,230 $880 Implemented
CO0481 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,030 $0 Implemented
CO0481 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $130 Implemented
CO0481 # 06 Y:2001 06 2001 USE OPTIMUM TEMPERATURE $820 $2,330 Implemented
CO0481 # 08 Y:2001 08 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $300 $130 Implemented
CO0481 # 09 Y:2001 09 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $160 $0 Implemented
CO0480 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,810 $1,470 Implemented
CO0480 # 04 Y:2001 04 2001 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,810 $3,750 Implemented
CO0480 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30 $0 Implemented
CO0478 # 01 Y:2000 01 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,280 $4,000 Implemented
CO0478 # 02 Y:2000 02 2000 INSULATE BARE EQUIPMENT $1,970 $2,360 Implemented