IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,456

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0653 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,630 $800 Implemented
CO0653 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,230 $91,620 Not Implemented
CO0653 # 04 Y:2011 04 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,380 $25,810 Not Implemented
CO0652 # 01 Y:2011 01 2011 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $11,990 $34,320 Implemented
CO0652 # 02 Y:2011 02 2011 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $7,570 $13,550 Not Implemented
CO0652 # 03 Y:2011 03 2011 USE SOLAR HEAT TO HEAT MAKE-UP AIR $7,530 $35,420 Not Implemented
CO0652 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,100 $870 Implemented
CO0651 # 01 Y:2011 01 2011 CONDENSE OPERATION INTO ONE BUILDING $17,750 $20,000 Not Implemented
CO0651 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,300 $110 Not Implemented
CO0651 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,530 $31,210 Not Implemented
CO0651 # 04 Y:2011 04 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,470 $20,920 Not Implemented
CO0651 # 05 Y:2011 05 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,030 $90 Not Implemented
CO0650 # 01 Y:2011 01 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,700 $1,000 Implemented
CO0650 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,390 $190 Implemented
CO0650 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,420 $9,240 Implemented
CO0650 # 04 Y:2011 04 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $2,980 $24,500 Not Implemented
CO0650 # 05 Y:2011 05 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $740 $1,470 Implemented
CO0649 # 01 Y:2011 01 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $12,260 $3,200 Not Implemented
CO0649 # 02 Y:2011 02 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $9,530 $20,000 Not Implemented
CO0649 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $2,610 $480 Not Implemented
CO0649 # 04 Y:2011 04 2011 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,270 $3,910 Not Implemented
CO0649 # 05 Y:2011 05 2011 INSTALL SKYLIGHTS $38,050 $70,550 Not Implemented
CO0649 # 06 Y:2011 06 2011 REDUCE VENTILATION AIR $3,200 $60 Not Implemented
CO0649 # 07 Y:2011 07 2011 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $2,770 $60 Not Implemented
CO0649 # 08 Y:2011 08 2011 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,150 $60 Not Implemented