IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0431 # 06 Y:1999 06 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $638,100 $0 Implemented
CO0431 # 07 Y:1999 07 1999 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $44,640 $0 Implemented
CO0430 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,060 $12,077 Implemented
CO0430 # 02 Y:1998 02 1998 INSTALL TURBULATORS $1,770 $5,750 Not Implemented
CO0430 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,470 $1,280 Implemented
CO0430 # 04 Y:1998 04 1998 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $-210 $2,000 Implemented
CO0430 # 05 Y:1998 05 1998 SELL COMBUSTIBLE WASTE $15,970 $56,700 Implemented
CO0430 # 06 Y:1998 06 1998 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $674,900 $1,645,000 Not Implemented
CO0429 # 01 Y:1998 01 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $840 $1,000 Implemented
CO0429 # 02 Y:1998 02 1998 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE $4,860 $0 Implemented
CO0429 # 03 Y:1998 03 1998 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT $2,930 $800 Not Implemented
CO0429 # 04 Y:1998 04 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $6,000 $10,160 Implemented
CO0429 # 05 Y:1998 05 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $730 $280 Not Implemented
CO0428 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,428 $8,036 Not Implemented
CO0428 # 02 Y:1998 02 1998 DISCONNECT BALLASTS $3,050 $350 Not Implemented
CO0428 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $50 Not Implemented
CO0428 # 04 Y:1998 04 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $500 $1,750 Not Implemented
CO0427 # 04 Y:1998 04 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $210 $0 Not Implemented
CO0427 # 05 Y:1998 05 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $34,700 $300,000 Not Implemented
CO0427 # 06 Y:1998 06 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $6,080 $30,000 Not Implemented
CO0427 # 07 Y:1998 07 1998 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS $18,250 $27,000 Implemented
CO0427 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $500 $2,082 Implemented
CO0427 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $290 $1,000 Implemented
CO0427 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $240 $40 Implemented
CO0426 # 01 Y:1998 01 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,960 $5,700 Implemented