IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,456

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0450 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,800 $15,000 Implemented
CO0450 # 03 Y:1999 03 1999 PURCHASE APPROPRIATELY SIZED MATERIAL $1,580 $0 Not Implemented
CO0448 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,820 $4,000 n/a
CO0448 # 02 Y:1999 02 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $830 $1,080 n/a
CO0448 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $430 $30 n/a
CO0448 # 04 Y:1999 04 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $380 $150 n/a
CO0448 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $210 n/a
CO0448 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20 $0 n/a
CO0448 # 07 Y:1999 07 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $160,300 $489,000 n/a
CO0448 # 08 Y:1999 08 1999 DEVELOP STANDARD OPERATING PROCEDURES $36,000 $0 n/a
CO0447 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,160 $5,000 Implemented
CO0447 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,270 $660 Implemented
CO0447 # 03 Y:1999 03 1999 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $2,250 $1,100 Not Implemented
CO0447 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $170 $0 Not Implemented
CO0447 # 05 Y:1999 05 1999 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $80,060 $200,000 Implemented
CO0447 # 06 Y:1999 06 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $29,130 $30,000 Not Implemented
CO0446 # 01 Y:1999 01 1999 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $16,050 $60,000 Not Implemented
CO0446 # 02 Y:1999 02 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,500 $9,500 Not Implemented
CO0446 # 03 Y:1999 03 1999 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $400 $1,000 Implemented
CO0446 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $350 $110 Not Implemented
CO0446 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $0 Implemented
CO0446 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $530 $0 Implemented
CO0446 # 07 Y:1999 07 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $839,300 $1,020,000 Not Implemented
CO0445 # 01 Y:1999 01 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $5,830 $0 Not Implemented
CO0445 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,570 $1,000 Implemented