IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0537 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,440 $1,800 Not Implemented
CO0537 # 07 Y:2003 07 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,030 $120 Not Implemented
CO0537 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,650 $260 Implemented
CO0537 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,830 $10,000 Not Implemented
CO0537 # 08 Y:2003 08 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,540 $500 Implemented
CO0537 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,550 $32,870 n/a
CO0537 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,219 $246 Not Implemented
CO0537 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,370 $350 Implemented
CO0536 # 07 Y:2003 07 2003 IMPROVE SPACE COMFORT CONDITIONING $50,000 $301,060 Not Implemented
CO0536 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,530 $1,050 Implemented
CO0536 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,720 $16,720 Not Implemented
CO0536 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,310 $870 Not Implemented
CO0536 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,299 $132 Not Implemented
CO0536 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,750 $1,410 Not Implemented
CO0536 # 03 Y:2003 03 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $3,380 $8,630 Not Implemented
CO0535 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $1,100 $2,820 Not Implemented
CO0535 # 09 Y:2003 09 2003 MODIFY WORKLOAD $30,340 $6,600 Not Implemented
CO0535 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,160 $15,760 Implemented
CO0535 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,340 $750 Implemented
CO0535 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,820 $6,420 Implemented
CO0535 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $411 $112 Implemented
CO0535 # 07 Y:2003 07 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $670 $1,210 Not Implemented
CO0535 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $30,840 $6,420 Not Implemented
CO0535 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,250 $9,690 Implemented
CO0534 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,330 $19,000 n/a