Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0121 # 12 Y:2022 | 12 | 2022 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $48,258 | $14,344 | Implemented |
CW0121 # 10 Y:2022 | 10 | 2022 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $6,639 | $5,500 | Implemented |
CW0121 # 09 Y:2022 | 09 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $608 | $165 | Implemented |
CW0121 # 07 Y:2022 | 07 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,581 | $0 | Implemented |
CW0121 # 06 Y:2022 | 06 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $461 | $517 | Implemented |
CW0121 # 05 Y:2022 | 05 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $31,088 | $86,330 | Implemented |
CW0121 # 03 Y:2022 | 03 | 2022 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $3,746 | $265 | Implemented |
CW0121 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,231 | $26,058 | Implemented |
CW0121 # 01 Y:2022 | 01 | 2022 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $3,129 | $400 | Implemented |
CW0120 # 07 Y:2021 | 07 | 2021 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,000,000 | $122,000 | Implemented |
CW0120 # 01 Y:2021 | 01 | 2021 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $30,000 | $70,084 | Implemented |
CW0120 # 02 Y:2021 | 02 | 2021 | INSTALL BACK-UP EQUIPMENT | $32,054 | $93,000 | Implemented |
CW0120 # 03 Y:2021 | 03 | 2021 | USE BATTERY STORAGE FOR DEMAND CONTROL | $18,089 | $25,885 | Implemented |
CW0120 # 04 Y:2021 | 04 | 2021 | MODIFY STARTUP/SHUTDOWN TIMES | $2,380 | $100,000 | Implemented |
CW0120 # 05 Y:2021 | 05 | 2021 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,965 | $510 | Implemented |
CW0120 # 06 Y:2021 | 06 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $899 | $0 | Implemented |
CW0120 # 08 Y:2021 | 08 | 2021 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $217 | $86 | Implemented |
CW0119 # 07 Y:2021 | 07 | 2021 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $5,837 | $1,000 | Implemented |
CW0119 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,381 | $6,000 | Implemented |
CW0119 # 02 Y:2021 | 02 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,402 | $1,640 | Implemented |
CW0119 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,804 | $0 | Implemented |
CW0117 # 10 Y:2020 | 10 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $879 | $5,742 | Implemented |
CW0117 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,334 | $255 | Implemented |
CW0117 # 06 Y:2020 | 06 | 2020 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $217,090 | $846,410 | Implemented |
CW0117 # 05 Y:2020 | 05 | 2020 | RECYCLE WHITE WATER | $2,598 | $6,039 | Implemented |