Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0121 # 12 Y:2022 | 12 | 2022 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $48,258 | $14,344 | Implemented |
CW0121 # 07 Y:2022 | 07 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,581 | $0 | Implemented |
CW0121 # 06 Y:2022 | 06 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $461 | $517 | Implemented |
CW0121 # 10 Y:2022 | 10 | 2022 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $6,639 | $5,500 | Implemented |
CW0121 # 09 Y:2022 | 09 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $608 | $165 | Implemented |
CW0121 # 05 Y:2022 | 05 | 2022 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $31,088 | $86,330 | Implemented |
CW0121 # 03 Y:2022 | 03 | 2022 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $3,746 | $265 | Implemented |
CW0121 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,231 | $26,058 | Implemented |
CW0121 # 01 Y:2022 | 01 | 2022 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $3,129 | $400 | Implemented |
CW0120 # 07 Y:2021 | 07 | 2021 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,000,000 | $122,000 | Implemented |
CW0120 # 01 Y:2021 | 01 | 2021 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $30,000 | $70,084 | Implemented |
CW0120 # 02 Y:2021 | 02 | 2021 | INSTALL BACK-UP EQUIPMENT | $32,054 | $93,000 | Implemented |
CW0120 # 06 Y:2021 | 06 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $899 | $0 | Implemented |
CW0120 # 08 Y:2021 | 08 | 2021 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $217 | $86 | Implemented |
CW0120 # 04 Y:2021 | 04 | 2021 | MODIFY STARTUP/SHUTDOWN TIMES | $2,380 | $100,000 | Implemented |
CW0120 # 05 Y:2021 | 05 | 2021 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,965 | $510 | Implemented |
CW0120 # 03 Y:2021 | 03 | 2021 | USE BATTERY STORAGE FOR DEMAND CONTROL | $18,089 | $25,885 | Implemented |
CW0119 # 07 Y:2021 | 07 | 2021 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $5,837 | $1,000 | Implemented |
CW0119 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,804 | $0 | Implemented |
CW0119 # 02 Y:2021 | 02 | 2021 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,402 | $1,640 | Implemented |
CW0119 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,381 | $6,000 | Implemented |
CW0117 # 04 Y:2020 | 04 | 2020 | HEAT WATER WITH EXHAUST HEAT | $1,331 | $2,149 | Implemented |
CW0117 # 05 Y:2020 | 05 | 2020 | RECYCLE WHITE WATER | $2,598 | $6,039 | Implemented |
CW0117 # 06 Y:2020 | 06 | 2020 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $217,090 | $846,410 | Implemented |
CW0117 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,334 | $255 | Implemented |