Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
832
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0244 # 01 Y:2024 | 01 | 2024 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $6,357 | $1,000 | Implemented |
DL0244 # 05 Y:2024 | 05 | 2024 | METER WASTE WATER | $7,907 | $2,000 | Implemented |
DL0244 # 02 Y:2024 | 02 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,768 | $0 | Implemented |
DL0243 # 03 Y:2024 | 03 | 2024 | ELIMINATE/REDUCE AN OPERATION | $2,346 | $520 | Implemented |
DL0241 # 02 Y:2024 | 02 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $7,985 | $4,420 | Implemented |
DL0241 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,075 | $5,000 | Implemented |
DL0240 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,194 | $3,716 | Implemented |
DL0240 # 05 Y:2024 | 05 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,202 | $14,500 | Implemented |
DL0240 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $49,476 | $225,000 | Implemented |
DL0240 # 03 Y:2024 | 03 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $40,323 | $0 | Implemented |
DL0240 # 02 Y:2024 | 02 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $9,910 | $0 | Implemented |
DL0240 # 01 Y:2024 | 01 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $12,775 | $0 | Implemented |
DL0239 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $397,405 | $140,000 | Implemented |
DL0239 # 03 Y:2024 | 03 | 2024 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $37,050 | $110,000 | Implemented |
DL0238 # 06 Y:2024 | 06 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $56,437 | $22,000 | Implemented |
DL0238 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $205,595 | $34,400 | Implemented |
DL0238 # 04 Y:2024 | 04 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $112,874 | $37,000 | Implemented |
DL0238 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $21,276 | $7,300 | Implemented |
DL0238 # 01 Y:2024 | 01 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $236,055 | $1,860,000 | Implemented |
DL0237 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,998 | $0 | Implemented |
DL0237 # 05 Y:2024 | 05 | 2024 | REDUCE VENTILATION AIR | $1,145 | $270 | Implemented |
DL0237 # 04 Y:2024 | 04 | 2024 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,180 | $64 | Implemented |
DL0237 # 06 Y:2024 | 06 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,985 | $4,000 | Implemented |
DL0237 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,341 | $0 | Implemented |
DL0237 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,667 | $0 | Implemented |